All VS1 Projects

Adobe Utah Campus
2012 WRNS 2012 WRNS

Adobe Utah Campus

A unique set of design parameters presented by the architectural design team at WRNS Studios resulted in the new VS1 mullion design. 42' openings required production of an extra deep 12.75” mullion with thicker walls that would resist lateral buckling loads.

Long Span · Exterior Mullions

Read More